FEATURES
Service temperature +5c +30c
Open time 20 minutes
Running time 1 hour
Rest time 5 minutes
Does not crack
It sticks to the surface easily
The strength at each point is the same
APPLICATION
A-preparation the surface to be applied is free from factors such as dust, paint and mold oil that will prevent holding, and the floor should be wetted.25 kg.ready-made plaster 6-7 lt.slowly discharge into clean water and mix with a low-speed mixer until there are no lumps and air bubbles.
B-APPLICATION
A maximum of 2.5 cm should be used on one floor. The second coat should be applied one day later if desired and should be used with a minimum thickness of 1 cm.
It is useful to prepare enough material to be used during application. Rough plastering is done with the help of a trowel
The use of lime is objectionable due to the chemical substances in the material itself.
PACKAGING
25 kg.Kraft bags
CONSUMPTION
15kg/m2 for 1 cm thickness
Storage dry and humidity free environment maximum 8 piles of unpacked original packaging 6 months
SECURITY
Avoid direct contact with the skin should be washed with plenty of water in contact. Adding water to the material that has reached the point of exceeding the Open release time distorts the material.
|